Maintenance Base IV

New build

Infrastructure

In 1993, the responsible road construction authority required a new base for operational maintenance on the cantonal road near Trin Mulin: The aim was to bring together staff rooms, parking facilities for service vehicles and space for equipment and materials storage under a single functional roof.

The building is divided into two clearly distinct structures: a solid wall housing the main functions, staff rooms, vehicle garages, and storage areas, and, running parallel to it, a free-standing salt silo. This division follows the functional logic of the operation, in which the salt storage facility stands as a separate technical structure alongside the main workshop, an arrangement common in cantonal maintenance depots in mountainous regions for operational and safety reasons.

Structurally, the main building rests on a solid wall clad with fine larch façade panelling. The salt silo, for its part, is clad in the same material, so that the two structures, despite their different uses and functional separation, appear as a cohesive ensemble.

location

Trin Mulin

occupancy

1993

client

Graubünden Civil Engineering Office

services

Complete services

Procedure

Direct commission

verfahren

Direct

Infrastructure

In 1993, the responsible road construction authority required a new base for operational maintenance on the cantonal road near Trin Mulin: The aim was to bring together staff rooms, parking facilities for service vehicles and space for equipment and materials storage under a single functional roof.

The building is divided into two clearly distinct structures: a solid wall housing the main functions, staff rooms, vehicle garages, and storage areas, and, running parallel to it, a free-standing salt silo. This division follows the functional logic of the operation, in which the salt storage facility stands as a separate technical structure alongside the main workshop, an arrangement common in cantonal maintenance depots in mountainous regions for operational and safety reasons.

Structurally, the main building rests on a solid wall clad with fine larch façade panelling. The salt silo, for its part, is clad in the same material, so that the two structures, despite their different uses and functional separation, appear as a cohesive ensemble.

location

Trin Mulin

occupancy

1993

client

Graubünden Civil Engineering Office

services

Complete services

Procedure

Direct commission

Ferienhaus Tschiel Fidaz Fassade Süd Luftaufnahme
New build
2015
Fidaz
Rendering of the exterior facade of the Sentupada Nova in Laax
New build
2023
Laax
MFH Gassmann Flims Waldhaus Terrassen und Balkone im Winter
New build
2014
Flims Dorf
Aussenansicht Casa Gronda
Renovation and Remodeling
2002
Trin Mulin
EFH Uetikon Garten mit Feuerring
New build
2020
Uetikon am See
Bartheke mit Fichteninnenausbau
Expansion
2003
Flims Dorf
Stenna Center Mieterausbau Hotel Restaurant THE HIDE Flims Arbeitstisch und Sitzgelegenheiten
Renovation
2023
Flims Dorf
RRT Büro Chur Küche und Esstisch
2023
Chur

Casa Novita

PHASE
Direct
Flims
4000
Haus Willi Flims Busshaltestelle mit den zwei Neubauten im Hintergrund

Casa Val Cotschna

Complete services

Direct

Fidaz
2012
MFH Val Cotschna Fidaz Südseite mit den Terrassen

Houses Jettli

Complete services
Direct
Flims Dorf
2021
Haus Jettli Altbau Flims Fassade im Winter

Psychiatric Hospital Beverin

Complete services
Direct
Flims Dorf
2003
Psychiatrische Klinik Beverin Hauptgebäude aussenansicht

Restaurant Stiva Veglia

Complete services
Direct
Schnaus
2010
Restaurant Aussenansicht

Residential and Office Building Grischuna

Ausführungsplanung | Baumanagement

Direct

Flims Waldhaus
2012
Ansicht von der Strasse

Legna Bar

Complete services
Direct
Flims Dorf
2003
Bartheke mit Fichteninnenausbau

Stenna Loft

Complete services

Direct

Flims Dorf
2023
Stenna Center Mieterausbau Hotel Restaurant THE HIDE Flims Arbeitstisch und Sitzgelegenheiten

Maintenance Base IV

Ansicht Fassade Einstellhalle

Infrastructure In 1993, the responsible road construction authority required a new base for operational maintenance on the cantonal road near Trin Mulin: The aim was to bring together staff rooms, parking facilities for service vehicles and space for equipment and materials storage under a single functional roof. The building is divided into two clearly distinct […]

×