Hospital Davos

Renovation and Extension

Health

Davos Hospital has been in existence since 1888. Although the premises had remained unchanged since 1977, they were no longer able to meet the changing requirements of a modern hospital. Outdated technical installations also made a complete refurbishment of the concrete building, with its characteristic perforated façade, unavoidable. The basis for the subsequent planning process was a design competition held in 2001 for the comprehensive refurbishment, supported by specialist consultants specialising in hospital planning.

The refurbishment was carried out in several phases between 2004 and 2008. This phased approach ensured that hospital operations continued uninterrupted throughout the construction period. The existing building, dating from 1977, was extended with a cube at its north-west corner, a logical geometric extension rather than a contrasting annexe. A new section of building was inserted between the hospital block and the adjacent care home, fulfilling two functions simultaneously: It spatially separates the different functional areas whilst also serving, with its reception, cafeteria, and kiosk, as an important hub and meeting place for residents, patients, and staff.

Whilst the two main buildings, the hospital and the care home, appear as solid concrete volumes, the connecting intermediate structure is designed as a transparent, light glass structure. This deliberate contrast makes the functional separation of the two uses visually apparent, whilst also enhancing the welcoming effect of the main entrance and reception area.

As part of the refurbishment, usage requirements and circulation routes were decoupled and optimised to create more efficient movement patterns. The A&E department was redesigned, and day-care units such as the day clinic, dialysis, and medical services were grouped together in a single area. The original four care floors were consolidated into three and supplemented with a maternity ward. Patient comfort was enhanced through the provision of accessible bathrooms and an expanded range of twin rooms. The complex was also supplemented by a new staff accommodation block with 50 studio flats, as well as an underground car park with 77 spaces, shared between the hospital and the staff accommodation block.
The project clearly demonstrates that hospital operations can be maintained throughout a construction period spanning several years without having to compromise on the spatial and functional reorganisation.

The project clearly demonstrates that ongoing hospital operations can be maintained over a multi-year construction period without having to compromise on spatial and functional reorganization.

location

Davos

planning | execution | completion

2001 | 2004 | 2008

services

Complete services

Procedure

Competition

verfahren

Direct

Health

Davos Hospital has been in existence since 1888. Although the premises had remained unchanged since 1977, they were no longer able to meet the changing requirements of a modern hospital. Outdated technical installations also made a complete refurbishment of the concrete building, with its characteristic perforated façade, unavoidable. The basis for the subsequent planning process was a design competition held in 2001 for the comprehensive refurbishment, supported by specialist consultants specialising in hospital planning.

The refurbishment was carried out in several phases between 2004 and 2008. This phased approach ensured that hospital operations continued uninterrupted throughout the construction period. The existing building, dating from 1977, was extended with a cube at its north-west corner, a logical geometric extension rather than a contrasting annexe. A new section of building was inserted between the hospital block and the adjacent care home, fulfilling two functions simultaneously: It spatially separates the different functional areas whilst also serving, with its reception, cafeteria, and kiosk, as an important hub and meeting place for residents, patients, and staff.

Whilst the two main buildings, the hospital and the care home, appear as solid concrete volumes, the connecting intermediate structure is designed as a transparent, light glass structure. This deliberate contrast makes the functional separation of the two uses visually apparent, whilst also enhancing the welcoming effect of the main entrance and reception area.

As part of the refurbishment, usage requirements and circulation routes were decoupled and optimised to create more efficient movement patterns. The A&E department was redesigned, and day-care units such as the day clinic, dialysis, and medical services were grouped together in a single area. The original four care floors were consolidated into three and supplemented with a maternity ward. Patient comfort was enhanced through the provision of accessible bathrooms and an expanded range of twin rooms. The complex was also supplemented by a new staff accommodation block with 50 studio flats, as well as an underground car park with 77 spaces, shared between the hospital and the staff accommodation block.
The project clearly demonstrates that hospital operations can be maintained throughout a construction period spanning several years without having to compromise on the spatial and functional reorganisation.

The project clearly demonstrates that ongoing hospital operations can be maintained over a multi-year construction period without having to compromise on spatial and functional reorganization.

location

Davos

planning | execution | completion

2001 | 2004 | 2008

services

Complete services

Procedure

Competition

Arena Express Flims Nagens Talstation in Flims
1997
Flims Dorf
Rendering of the exterior facade of the Sentupada Nova in Laax
New build
2023
Laax
Stenna Center Mieterausbau Hotel Restaurant THE HIDE Flims Schlafzimmer mit Doppelbett
2019
Flims Dorf
MFH Baumann Spycher Flims Dorf Fassade aus Holz.
2013
Flims Dorf
RRT Büro Chur Küche und Esstisch
2023
Chur
EFH Salisstrasse Chur Gesamtaufnahme Haus und Garten
2020
Chur
Bartheke mit Fichteninnenausbau
Expansion
2003
Flims Dorf
Psychiatrische Klinik Beverin Hauptgebäude aussenansicht
Renovation and Remodeling
2003
Flims Dorf

Casa Novita

Complete services
Direct
Flims Dorf
2025
Haus Willi Flims Busshaltestelle mit den zwei Neubauten im Hintergrund

Psychiatric Hospital Beverin

Complete services
Direct
Flims Dorf
2003
Psychiatrische Klinik Beverin Hauptgebäude aussenansicht

Avers Barns

Complete services
Direct
Avers
2018
avers-stalle-avers-facade-and-view-of-the-avner-mountains

House am Waldrand

Complete services
Direct
Flims Waldhaus
2013
MFH Haus am Waldrand Flims Waldhaus Fassade Süd und Garten

Stenna Loft

Complete services

Direct

Flims Dorf
2023
Stenna Center Mieterausbau Hotel Restaurant THE HIDE Flims Arbeitstisch und Sitzgelegenheiten

Hospital Davos

Complete services
Direct
Davos
2008
Spital Davos Lugtaufnahmen

Sheepfold, University of Teacher Education Graubünden

Complete services

Direct

Chur
1993
University of Teacher Education Chur exterior view and view of the city

House Porta Pfister

Complete services
Direct
Trin Mulin
2020
Porta Pfister Trin Zufahrt zum Haus im Winter

Hospital Davos

Spital Davos Lugtaufnahmen

Health Davos Hospital has been in existence since 1888. Although the premises had remained unchanged since 1977, they were no longer able to meet the changing requirements of a modern hospital. Outdated technical installations also made a complete refurbishment of the concrete building, with its characteristic perforated façade, unavoidable. The basis for the subsequent planning […]

×